MacLehose Trail Section 1 麥理浩徑第一段 (10.6 km)
Garro Ho
Dec 14. 2003
garro@garroho.com
page 4 of 7
An embankment surrounds the west dam and has formed a man-made lagoon. The total area stretches 15 hectares.
The area was formerly a Vietnamese detention centre and is now the "Chong Hing Water Sports Centre".
Once you reach the bottom of the stairs at the east dam, turn right and continue forward